The Midia Gas Development project (MGD project) consists of the Ana and Doina gas fields (roughly 10 Bcm of resources) which were discovered in 1995 and 2007 respectively. Both are of latest Miocene to Dacian age, shallow, marine sandstone (delta-tops), biogenic gas reservoirs, some 120 km offshore Romania, in the XV Midia Shallow area where the water depths are of 70 meters.
In terms of facilities, the MGD project consists of 5 production wells (1 well at Doina field and 4 wells at Ana field) a subsea gas production system over the Doina well which is connected through an 18 km pipeline with a new unmanned production platform located over Ana field. A 121 km subsea pipeline ensures the delivery of the gas from Ana platform to the shore where it continues with a 4.1 km underground pipeline to the new GTP. The processed gas is delivered into the NTS operated by Transgaz at the gas metering station to be found within the GTP.
The four wells at Ana platform were put into production in the 2nd quarter of 2022 and first gas was delivered to the National Transmission System on June 15th, 2022. The last well in the project, the single Doina subsea, was successfully drilled and gravel packed by the end of the 2nd quarter of 2022. The connection to the Ana platform is scheduled to occur late 2022.